• Subtitle
    Choose Server
    • Server 1
    • Server 2
    • Server 3
Please choose another server if the video doesn't work or there is an error in the video
Studio 60 on the Sunset Strip

1 Season
22 Episode

Studio 60 on the Sunset Strip - Season 1 Episode 5 The Long Lead Story


(118 votes, average: 7.40/ 10)

42 minutes 2025 HD

  • Share

During cast rehearsals with Lauren Graham and Sting, a reporter attempts to get the real story on Matt and Harriet. Meanwhile Jordan passes on a tasteless new reality series.

img

Season

Similar

  • 2013
    img

    Being Mary Jane

    Being Mary Jane

    7.12 2013 HD

    Mary Jane Paul is a one-woman-show: a successful TV news anchor, and an entirely self-sufficient powerhouse who remains devoted to a family that...

    img
  • 1966
    img

    Hero

    Hero

    5.00 1966 HD

    The Hero is an American television sitcom that aired on NBC on Thursday Night at 9:30pm from September 8, 1966 to January 5, 1967.

    img
  • 2003
    img

    An American in Canada

    An American in Canada

    1 2003 HD

    Jake Crewe is an American television news host who is forced, after beating up his station manager, to accept a job in Calgary, Alberta as the host...

    img
  • 2002
    img

    Less than Perfect

    Less than Perfect

    6.90 2002 HD

    Claude Casey moved up in the secretarial world of television news, from temp to the anchor's desk. After her boss hires her full time, Claude...

    img
  • 1970
    img

    Nobody's Watching

    Nobody's Watching

    1 1970 HD

    Nobody's Watching is a television program that was never aired. It originated with and was written by Scrubs creator Bill Lawrence, as well as Neil...

    img
  • 1983
    img

    Telecat

    Telecat

    7.20 1983 HD

    Created by French surrealist artist Roland Topor and director Henri Xhonneux, Telecat is a news show parody hosted by a tomcat named Groucha (who...

    img
  • 1998
    img

    LateLine

    LateLine

    1 1998 HD

    LateLine is an American TV sitcom that ran on NBC from March 17, 1998, through March 16, 1999. Due to an abrupt cancellation, there were seven...

    img
  • 1981
    img

    Fitz and Bones

    Fitz and Bones

    1 1981 HD

    Fitz and Bones is a short-lived American television series, starring Dick and Tom Smothers, that aired on NBC in 1981.

    img
  • 2022
    img

    Inside Legacy Cinema

    Inside Legacy Cinema

    9.00 2022 HD

    A Behind The Scenes series documenting the on set antics of the cast and crew at Legacy Cinema, spanning their entire ongoing indie career....

    img
  • 2015
    img

    Kingi

    Kingi

    2.20 2015 HD

    A Finnish parody tv show about mainstream singing contests.

    img

Recomendation

  • 2011
    img

    Billy on the Street

    Billy on the Street

    6.60 2011 HD

    Comedian Billy Eichner, unfiltered and unapologetic, hits the streets of New York City to test unsuspecting strangers on their knowledge of music and...

    img
  • 1982
    img

    Faerie Tale Theatre

    Faerie Tale Theatre

    8.20 1982 HD

    A live-action children's television anthology series retelling popular fairy tales.

    img
  • 2015
    img

    Texas Rising

    Texas Rising

    6.23 2015 HD

    A chronicle of the Texas Revolution, the uprising against the tyranny of Mexican dictator Santa Anna, from the battle of the Alamo to the battle of...

    img
  • 1999
    img

    Jack & Jill

    Jack & Jill

    7.50 1999 HD

    A lighthearted romantic comedy about post-collegiate life, love and career in New York City.

    img
  • 2013
    img

    Newsreaders

    Newsreaders

    7.38 2013 HD

    Newsreaders is a quarter-hour format American television comedy that lampoons the news magazine genre. The series is a spinoff of the Adult Swim show...

    img
  • 1993
    img

    Family Passions

    Family Passions

    9.00 1993 HD

    Family Passions was the first hour long television serial produced in Canada and Germany. It was produced and distributed by Baton Broadcasting...

    img
  • 1998
    img

    The Hughleys

    The Hughleys

    6.55 1998 HD

    The Hughleys is an American sitcom that aired on ABC from September 22, 1998 to April 28, 2000 and on the UPN network from September 11, 2000 to May...

    img
  • 2008
    img

    Life on Mars

    Life on Mars

    6.48 2008 HD

    After a car crash, police detective Sam Tyler mysteriously finds himself transported back to 1973 and still working as a detective.

    img
  • 2007
    img

    The Dresden Files

    The Dresden Files

    6.90 2007 HD

    A Chicago-based wizard works as a private investigator.

    img
  • 2008
    img

    Sense and Sensibility

    Sense and Sensibility

    7.59 2008 HD

    Marianne Dashwood wears her heart on her sleeve when she falls in love with the charming but unsuitable John Willoughby, ignoring her sister Elinor's...

    img